亚洲国产精久久久久久久,久久精品视频免费观看,欧美亚洲另类色国产综合,国产精品国产三级国快看

全自動(dòng)涼茬機電機使用前的檢查方法

發(fā)布于:2022-07-21 14:40:07  來(lái)源:http://m.sdlngcjx.com

全自動(dòng)涼茬機的使用提高了冷卻效果、降低了功耗,了現有設備自積堵塞現象,并實(shí)現了酒茬和酒曲的自動(dòng)混合,那么您知道全自動(dòng)涼茬機電機使用前的檢查方法是怎樣嗎?
The use of automatic stubble cooler improves the cooling effect, reduces power consumption, solves the self accumulation and blockage of existing equipment, and realizes the automatic mixing of wine stubble and distiller's yeast. Do you know the inspection method of automatic stubble cooler motor before use?
全自動(dòng)涼茬機主要由機架、風(fēng)機、傳送帶和依次連接于傳送帶上的攪籠、打料棍、翻料棍、下料裝置、出料管組成,使用時(shí),酒茬在傳送帶上通過(guò),在打碎和攪拌的同時(shí)風(fēng)機工作,迅速降溫,冷卻后的酒茬在下料裝置中與酒曲自動(dòng)混合均勻。
The full-automatic stubble cooler is mainly composed of a frame, a fan, a conveyor belt and a stirring cage, a beating stick, a turning stick, a blanking device and a discharge pipe connected to the conveyor belt in turn. When in use, the stubble passes through the conveyor belt. While crushing and mixing, the fan works to quickly cool down. The cooled stubble is automatically mixed with koji in the blanking device.
在啟動(dòng)全自動(dòng)涼茬機機之前,我們應當先檢查機器的電機是否正常,再去啟動(dòng)設備。在檢查時(shí),應同時(shí)使用吹風(fēng)機對電機內的灰塵等污垢雜物清理干凈,還要測量接線(xiàn)是否合格,如果發(fā)現電機出現機械損傷或者火花灼痕應當立即進(jìn)行必要的處理工作。
Before starting the automatic stubble cooler, we should first check whether the motor of the machine is normal, and then start the equipment. During the inspection, the blower should be used to clean the dust and other dirt in the motor at the same time, and measure whether the wiring is qualified. If the motor is found to have mechanical damage or spark burns, necessary treatment should be carried out immediately.
全自動(dòng)涼茬機
1、用壓縮空氣或手動(dòng)吹風(fēng)機吹凈電動(dòng)機內部灰塵、電刷粉末等,污垢雜物。
1. Blow the dust and brush powder inside the motor with compressed air or manual blower to remove dirt and sundries.
2、拆除與電動(dòng)機連接的一切接線(xiàn),用絕緣電阻表測量繞組對機座的絕緣電阻。若小于0.5MΩ時(shí),應進(jìn)行烘干處理,測量合格后再將拆除的接線(xiàn)恢復。
2. Remove all wiring connected to the motor, and measure the insulation resistance of the winding to the base with an insulation resistance meter. If it is less than 0.5m Ω, it should be dried, and the removed wiring should be restored after the measurement is qualified.
3、檢查涼全自動(dòng)涼茬機換向器的表面是否光潔,如發(fā)現有機械損傷或火花灼痕應進(jìn)行必要的處理。
3. Check whether the surface of the commutator of the full-automatic stubble cooler is smooth and clean. If mechanical damage or spark burn marks are found, necessary treatment should be carried out.
4、檢查電刷是否嚴重損壞,刷架的壓力是否適當,刷架的位置是否位于標記的位置。
4. Check whether the brush is seriously damaged, whether the pressure of the brush holder is appropriate, and whether the position of the brush holder is at the marked position.
5、根據全自動(dòng)涼茬機電動(dòng)機銘牌檢查直流電動(dòng)機各繞組之間的接線(xiàn)方式是否正確,電動(dòng)機額定電壓與電源電壓是否相符,電動(dòng)機的起動(dòng)設備是否符合要求,是否完好無(wú)損。
5. According to the nameplate of the motor of the automatic stubble cooler, check whether the wiring mode between the windings of the DC motor is correct, whether the rated voltage of the motor is consistent with the power supply voltage, and whether the starting equipment of the motor meets the requirements and is intact.
以上便是對全自動(dòng)涼茬機電機使用前的檢查方法的簡(jiǎn)單介紹,了解更多設備內容就來(lái)關(guān)注我們網(wǎng)站http://m.sdlngcjx.com吧!
The above is a brief introduction to the inspection methods of the automatic stubble cooler motor before use. For more information about the equipment, please pay attention to our website http://m.sdlngcjx.com Come on!

咨詢(xún)熱線(xiàn):
0537-4556677